Hi Experts,
We are facing a problem while upgrading the Netweaver CE Java 7.11 to 7.30 patch level 5 in Phase EXECUTION step START THE SYSTEM FOR JAVA.
The existing system NW CE 7.11 is installed using system copy method export/import in distributed environment and installation was successful without any errors.
While upgrading NWCE 7.11 to 7.30 the EXECUTION phase step START - JAVA SYSTEM step is throwing an error and it is not moving further.
We are using the SUM upgrade tool SP 01 with patch 03. We have gone though the SUM Central note 1591328, in the note it is suggested to restart the step and it will solve the problem, but it is not going further.
Has any one is having solution for this problem, the problem is IGSWD is not starting in the SAP MMC, it is stopped.
Thanks and regards
Veera Reddy Kothapalli
This open post was written 1 year ago | V/U/S: 362, 4, 3 | Edit Post | Leave a reply | Report Post
Reciprocity (0)
Since writing this post kothapalli39 may have helped people, but has not within the last 4 days. kothapalli39 is a verified member, has been around for 1 year and has 1 posts and 0 replies to their name.
Invite Others to Help
A logged in and verified Help.com member has the ability to setup a Friends List and invite others to help with posts.
